Qlima R7127TC User Manual

Page 75

Advertising
background image

4

75

15. Reposition 4 wing nuts on the mounting stud, but do

not tighthen them.

16. Raise the wick to its highest position and tighten the

wing nuts in several steps.

17. Check the wick height. It should be 5/16 inch above the

collar.

18. Check for the correct clearance between wick holder

and draft tube. It should be the same all around.

19. Reinstall the tip-over switch assembly by pushing the

extinguish knob .

20. Check the function of the tip-over safety stop by push-

ing the extinguish button  to activate the pendulum.

21. Reinstall the automatic ignition assembly.
22. Reinstall the wind cover A / B.
23. Reinstall the ignitor coil K.
24. Reinstall the cabinet .
25. Tighten the 5 screws on the cabinet and reinstall the

sensor at the back of the cabinet .

26. Reinstall the combustion chamber 4 and the fuel tank

.

27. Reinstall the knurled wick adjustment knob 2. Close

the front plate.

Install the batteries in the battery case and fill the fuel tank
with Premium Quality Fuels. Put the tank into the heater
and wait at least 30 minutes for the new wick to fully satu-
rate with the fuel.

Advertising
This manual is related to the following products: