Vertical termination – Empire Comfort Systems DVP48FP3 EN User Manual

Page 43

Advertising
background image

21759-6-0608

Page 43

Locate and mark the center point of the venting pipe. Using a nail

on the underside of the roof and drive this nail through this center

point. Make the outline of the roof hole around this center point.
NOTE: Size of the roof hole dimensions depend on the pitch of

the roof. There must be a 1 inch clearance (25mm) to the

vertical pipe sections. This clearance is to all combustible

material.

Cover the opening of the vent pipe and cut and frame the roof hole.

Use framing lumber the same size as the roof rafters and install the

frame securely. Flashing anchored to frame must withstand high

winds. The storm collar is placed over this joint to make a water-

tight seal. Non-hardening sealant should be used to completely seal

this flashing installation.
Determining Minimum Vent Height Above the Roof.
WARNING: Major U.S. building codes specify minimum

chimney and/or vent height above the roof top. These minimum

heights are necessary in the interest of safety. These specifica-

tions are summarized in Figure 73.

Figure 73

Note that for steep roof pitches, the vent height must be increased.

In high wind conditions, nearby trees, adjoining roof lines, steep

pitched roofs, and other similar factors can result in poor draft,

or down-drafting. In these cases, increasing the vent height may

solve this problem.

When terminating the vent cap near an exterior wall or overhang,

maintain minimum clearances as shown in Figure 74.
General Maintenance

Conduct an inspection of the venting system semi-annually.

Recommended areas to inspect are as follows:

1. Check areas of the venting system which are exposed to the

elements for corrosion. These will appear as rust spots or

streaks and, in extreme cases, holes. These components should

immediately be replaced.

2. Remove the cap and shine a flashlight down the vent. Remove

any bird nests or other foreign material.

3. Check for evidence of excessive condensate, such as water

droplets forming in the inner liner and subsequently dripping

out at joints. Condensate can cause corrosion of caps, pipe and

fittings. It may be caused by having excessive lateral runs, too

many elbows and exterior portions of the system being exposed

to cold weather.

4. Inspect joints to verify that no pipe sections or fittings have been

disturbed and, consequently, loosened. Also, check mechanical

supports, such as wall straps or plumbers’ tape for rigidity.

Venting terminal shall not be recessed into a wall or siding.
A removable panel or other means must be provided in the enclosure

for visual inspection of the flue connection.
NOTE: This also pertains to vertical vent systems installed on the

outside of the building.
Slide the vertical vent cap over the ends of the vent pipe and secure.

See Figure 75.
Installing the Vent System in a Chase

A chase is a vertical box-like structure built to enclose the gas

appliance and/or it’s vent system. Vertical vent runs on the outside

of a building may be, but are not required to be installed inside a

chase.

VENT CAP

GAS VENT

H

LOWEST

DISCHARGE

OPENING

H (Min.) - Minimum height from

roof to lowest discharge opening

ROOF PITCH IS X/12

ROOF PITCH

H (Min.)

Flat to 6/12

12" (305 mm)

6/12 to 7/12

15" (381 mm)

Over 7/12 to 8/12

18" (457 mm)

Over 8/12 to 16/12

24" (610 mm)

Over 16/12 to 21/12

36" (914 mm)

VERTICAL TERMINATION

Figure 74

Advertising
This manual is related to the following products: