Corner installations, Vertical installation, Corner installations vertical installation – Enviro C-10365 User Manual

Page 12: Initial installation

Advertising
background image

12

Initial Installation

QUALIFIED INSTALLERS ONLY

V

ERTICAL

I

NSTALLATION

:

STEP 1. Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings,

walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air spaces with

insulation.

C

ORNER

I

NSTALLATIONS

:

Figure 13: Corner installation top vented.

Figure 14: Wall Framing for 10” (25.4 cm) x 10” (25.4

cm) Hole for Vertical Installation.

STEP 2. Set the gas appliance in the desired location.

Drop a plumb bob down from the ceiling to the

position of the appliance flue exit, and mark

the location where the vent will penetrate the

ceiling. Drill a small hole at this point. Next,

drop a plumb bob from the roof to the hole

previously drilled in the ceiling, mark the

spot where the vent will penetrate the roof.

Determine if ceiling joists, roof rafters, or

other framing will obstruct the venting system.

You may wish to relocate the appliance, or to

offset, to avoid cutting load bearing members.

STEP 3. To install the Round Support Box/Wall Thimble

in a flat ceiling, cut a 10 inch (25.4 cm) square

hole in the ceiling, centered in the hole drilled

in Step 2. Frame the hole as shown in Figure

14.

STEP 4. Assemble the desired lengths of black pipe and

elbows necessary to reach from the appliance

adapter up through the Round Support Box.

Insure that all pipe and elbow connections are

in their fully twist-locked position.

Do not interfere with the structural integrity

of the walls.

Advertising
This manual is related to the following products: