Refrigeration – Envision Peripherals Series User Manual

Page 19

Advertising
background image

17

NS SPLIT INSTALLATION MANUAL

The Envision series comes with a holding charge. The charge must be adjusted in the field based on performance.

Refrigeration piping on the split consists of installing a brazed copper line set between the blower coil unit and the unit’s split

compressor section. To select the proper tube diameters for the installation, refer to the table on page 9. Line sets over 60

feet long are not recommended because of oil return and pressure drop problems. The suction line must always be insu-

lated. Handle and route the line sets carefully to avoid kinking or bending the tubes. If the line set is kinked or distorted and

it cannot be formed back into its original shape, the bad portion of the pipe should be replaced. A restricted line set will affect

the performance of the system.

Connection to Air Coil

Figures 1 and 2 illustrate typical Envision Split installations. The table on page 9 shows typical lineset diameters and

maximum length. As in all R-410A equipment, a reversible liquid line filter drier is required to insure all moisture is removed

from the system. This drier should be replaced whenever “breaking into” the system for service. All linesets should be

insulated with a minimum of 1/2” closed cell insulation. All insulation should be painted with UV resistant paint or covering to

insure long insulation life.

Fasten the copper line set to the blower coil unit as instructed by the coil installation instructions. Nitrogen should be bled

through the system at 2 to 3 PSI to prevent oxidation inside the refrigerant tubing. Use a low silver phos-copper braze alloy

on all brazed connections.

Braze line set to the service valve stubs on the

inside front of the split cabinet as shown in Figure 7.

Nitrogen should be bled through the system at 2 to

3 PSI to prevent oxidation contamination. Use a low

silver phos-copper braze alloy on all brazed connec-

tions. Envision split units are shipped with a factory

charge and service valves are not to be opened

until the line set has been leak tested, purged and

evacuated. Schrader cores should be removed

before brazing. A heat sink should be used on the

service valves and TXV to prevent damage caused

by excessive heat.

Refrigeration

Replace caps after

opening system

Service ports for

attaching refrigerant

gauges

Insulated

Suction Line

Braze

Connection

Liquid

Line

ccw

ccw

Figure 7: Typical Split System Refrigerant Line Connections