General installation information (cont.), Dual fuel systems – Envision Peripherals Series User Manual

Page 8

Advertising
background image

6

NS SPLIT INSTALLATION MANUAL

Dual Fuel Systems

Envision units can be connected to fossil fuel furnaces that include an A-coil or slab coil. Dual fuel installations utilize the

Envision heat pump for heating until the point that auxiliary heat is called for on the thermostat. At that point, the furnace

will be enabled and the heat pump will be disabled. The Envision heat pump provides air conditioning through the furnace’s

refrigerant coils.

Refer to the furnace manufacturer’s installation manual for the furnace installation, wiring and coil insertion. A

WaterFurnace Dual Fuel thermostat, a field-installed DPST relay or dual capacity auxiliary heat relay is required. See Figure

2 for typical Dual Fuel application.

In add-on Envision Split applications, the coil should be located in the supply side of the furnace to avoid condensation

damage to the furnace heat exchanger. A high temperature limit should be installed upstream of the coil to de-energize the

compressor whenever the furnace is operating. Without this switch, the Envision Split will trip out on high pressure. A dual

fuel thermostat can remove the Y1 and Y2 calls when a W call is energized to allow gas furnace backup on an Envision Split

application. Refer to thermostat wiring on page 13 for details.

Thermostat

Wire From Furnace

Wire To

Thermostat

Up-Flow

Fossil Fuel

Furnace

Condensate

Drain

(must be trapped)

"A" or

Slab Coil

Supply Duct

Insulated

Suction Line

Return

Duct

Lineset To Air Handler

Disconnect

Figure 2: Typical Split System Heat Pump Coil Add-On Fossil Fuel Furnace

General Installation Information (cont.)

Advertising