General installation information (cont.) – Envision Peripherals Series User Manual

Page 6

Advertising
background image

4

NS SPLIT INSTALLATION MANUAL

been made to assure that the duct system has the capacity to handle the air required for the unit application. If ducting

is too small, as in replacement of heating only systems, larger ductwork should be installed. All existing ductwork should

be checked for leaks and repairs made accordingly. The duct systems and diffusers should be sized to handle the design

airflow quietly. If air noise or excessive airflow is a problem, the blower speed can be changed to a lower speed to reduce

airflow. This will reduce the performance of the unit slightly in heating; however, it will increase the temperature rise across

the air coil. Airflow must still meet minimum requirements.

Equipment Selection

The following guidelines should be used when mating an Envision Split to an air handler/coil.

Select R-410A components only.

Match the air handler to the air handler coil data table.

Indoor matching adjustable TXV is factory installed on every air handler/coil. Fixed orifice or cap tube systems

should not be used.

Utilizing Existing Coil or Air Handler

It is recommended that a new R-410A air handler be installed with an Envision Split considering the long term benefits

of reliability, warranty, etc. versus the short term installation cost savings. However, the existing air handler may be retained

provided the following:

Coil currently is R-410A rated

Coil uses a TXV. No capillary or fixed orifice systems should be used

A life expectancy of more than 7 years remaining for the air handler and components

General Installation Information (cont.)

Advertising