C. vertical penetration framing – Heat & Glo Fireplace Soho24B 2137-900 User Manual

Page 17

Advertising
background image

17

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

C. Vertical Penetration Framing

Figure 6.3

Figure 6.4 Installing the Attic Shield

A ceiling fi restop MUST be used between
fl oors and attics.

• Frame opening 9 in. x 9 in. (229 mm x 229

mm) whenever the vent penetrates a ceiling/
fl oor (see Figure 6.3).

• Frame the area with the same sized lumber

as used in ceiling/fl oor joist.

• The ceiling fi restop may be installed above or

below the ceiling joists when installed with a
attic insulation shield. It must be under joists
between fl oors that are not insulated. Refer
to Figure 6.4.

• Secure with three fasteners on each side.

WARNING! Risk of Fire! DO NOT pack
insulation around the vent. Insulation must be
kept back from the pipe to prevent overheating.

ATTIC ABOVE

A

PIPE

SLP

A

9 in. (229 mm)

A

3 FASTENERS

PER SIDE

INSTALL ATTIC INSULATION SHIELDS

BEFORE OR AFTER INSTALLATION OF VENT SYSTEM

CEILING FIRESTOP

INSTALLED BELOW CEILING

CEILING FIRESTOP

INSTALLED ABOVE CEILING

Advertising