HP PROLIANT ML330 G6 User Manual

Page 68

Advertising
background image

Hardware options installation 68

IMPORTANT:

The battery pack might have a low charge when installed. In this case, a POST

error message is displayed when the server is powered up, indicating that the battery pack is

temporarily disabled. No action is necessary on your part. The internal circuitry automatically

recharges the batteries and enables the battery pack. This process might take up to four hours.

During this time, the cache module functions properly, but without the performance advantage
of the battery pack.

NOTE:

The data protection and the time limit also apply if a power outage occurs. When

power is restored to the system, an initialization process writes the preserved data to the hard

drives.

To install the component:

1.

Power down the server (on page

20

).

2.

Do one of the following:

o

Open or remove the tower bezel, as needed ("

Open or remove the tower bezel

" on page

20

).

o

Extend the server from the rack (on page

21

).

3.

Remove the access panel (on page

21

).

4.

Install the storage controller, if not installed ("

Installing expansion boards

" on page

63

).

5.

Open the cache module latches.

6.

Install the cache module on the controller.

Advertising