Section 5 − installation, 1. installing welding gun, 2. installing work clamp – Hobart Welding Products HANDLER 140 User Manual

Page 16

Advertising
background image

OM-925 Page 12

SECTION 5 − INSTALLATION

5-1. Installing Welding Gun

803 711-A

1

Drive Assembly

2

Gun Securing Thumbscrew

3

Gun End

Loosen thumbscrew. Insert end

through opening until it bottoms

against drive assembly. Tighten

thumbscrew.
Welding gun must be inserted

completely to prevent leakage of

shielding gas.
4

Gun Trigger Leads

Insert leads, one at a time, through

gun opening on front panel.

Connect female friction terminals to

matching male terminals in unit.

Polarity is not important.
Close door.

4

1

2

3

5-2. Installing Work Clamp

1

Insulating Sleeves

2

Nut

3

Work Cable From Unit

Slide one insulating sleeve over

work cable before connecting to

clamp.
4

Work Clamp

5

Screw

6

Work Clamp Tabs

Bend tabs around work cable.
Slide insulating sleeves over

handles.

802 456-A

Tools Needed:

3/8, 7/16 in

1

2

3

4

5

6

Advertising
This manual is related to the following products: