Section 5 − installation, 1. installing welding gun, 2. installing work clamp – Hobart Welding Products HANDLER 210 User Manual

Page 15

Advertising
background image

OM-227 978 Page 11

SECTION 5 − INSTALLATION

5-1. Installing Welding Gun

804 686-A

1

Drive Assembly

2

MIG Gun

3

Gun Securing Thumbscrew

4

Gun End

Loosen thumbscrew. Insert end

through opening until it bottoms

against drive assembly. Tighten

thumbscrew.
Welding gun must be inserted

completely to prevent leakage of

shielding gas.
5

Gun Trigger Plug

Insert plug into receptacle, and

tighten threaded collar.
6

Spool Gun/MIG Gun Switch

Place switch in MIG Gun position.
Close door.

Correct

Incorrect

.

Be sure that gun end is tight against drive assembly.

3

Gun Fully Seated

3

Gun Not Seated

Exposed O-rings

will cause shielding

gas leakage.

5

1

3

2

Spool Gun

MIG Gun

6

4

ЙЙЙ

ЙЙЙ

ЙЙЙ

5-2. Installing Work Clamp

1

Nut

2

Work Cable From Unit

3

Work Clamp

4

Screw

5

Work Clamp Tabs

Bend tabs around work cable.
6

Insulating Sleeves

Slide one insulating sleeve over

work cable before connecting to

clamp.
Slide insulating sleeves over

handles.

802 456-A

.

Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor

weld performance and excessive heating of the work clamp.

Tools Needed: