C. vent termination – Hearth and Home Technologies BE-36-CIPI User Manual

Page 26

Advertising
background image

Hearth & Home Technologies • BE-36-C, BE-36-CIPI • 397-981 Rev. R • 2/05

26

C. Vent Termination

SL-Series Venting Only:

For Horizontal Terminations - To attach and secure the
termination to the last section of horizontal vent:

• Rotate and interlock the ends as described at the begin-

ning of the Installing Vent Components section.

• The termination kit should pass through the wall firestops

from the exterior of the building.

• Adjust the termination cap to its final exterior position on

the building.

For trapezoidal cap termination kits:

• Using screws secure the cap to the exterior wall through

the flanges in the cap.

For DVP Venting Only:

Refer to Cinch Pipe and Termination Cap installation in-
structions.

Figure 25. Trapezoid Termination Cap

7 1/4"

(184mm)

!

WARNING: THE TERMINATION CAP MUST
BE POSITIONED SO THAT THE ARROW IS
POINTING UP.

!

WARNING: VENTING TERMINALS SHALL NOT
BE RECESSED INTO A WALL OR SIDING. VENT
TERMINATION CLEARANCES MUST BE FOL-
LOWED TO AVOID FIRE DANGER. SEE VENT TER-
MINATION MINIMUM CLEARANCES DIAGRAM ON
FOLLOWING PAGE.

For All Venting:

Figure 23. Ceiling Firestop (Ceiling Side)

If the area above the ceiling is NOT an attic, position and
secure the ceiling firestop on the ceiling side of the previously
cut and framed hole.

If the area above the ceiling IS an attic, position and secure
the firestop on top of the previously framed hole.

NOTE: Keep insulation away from the vent pipe at least
1 inch (25mm).

Figure 24. Attic Firestop

JOIST

CEILING FIRESTOP

CEILING

NAILS (4 REQUIRED)

NAILS (3 REQUIRED)

CEILING

CEILING FIRESTOP

RAFTER

NAILS (3 REQUIRED)

Advertising
This manual is related to the following products: