10. installing gas supply – Hobart Welding Products IRONMAN 250 User Manual

Page 18

Advertising
background image

OM-192 440 Page 14

3-10. Installing Gas Supply

Ref. 220 747-A / 802 028-A / Ref. 802 286-E

Tools Needed:

1-1/8, 5/8 in

1

2

3

Argon Gas Or

Mixed Gas

Rear Panel

6

.

DO NOT use Argon/Mixed gas regulator/flowmeter
with CO

2

shielding gas. See Parts List for optional

CO

2

gas regulator/flowmeter.

Obtain gas cylinder and chain to

running gear, wall, or other

stationary support so cylinder

cannot fall and break off valve.
1

Cap

2

Cylinder Valve

Remove cap, stand to side of

valve, and open valve slightly. Gas

flow blows dust and dirt from valve.

Close valve.
3

Cylinder

4

Regulator/Flowmeter

Install so face is vertical.
5

Regulator/Flowmeter Gas

Hose Connection

6

Welding Power Source Gas

Hose Connection

Connect customer supplied gas

hose between regulator/flowmeter

gas hose connection, and fitting on

rear of welding power source.
7

Flow Adjust

Typical flow rate is 20 cfh (cubic

feet per hour). Check wire

manufacturer’s recommended

flow rate.

4

5

7

Advertising