Hobart Welding Products IRONMAN 250 User Manual

Page 21

Advertising
background image

OM-192 440 Page 17

3-13. Selecting A Location And Connecting Input Power

803 766-B / 802 286-E

4

2

Y Do not move or operate

unitwhere it could tip.

18 in (457 mm) of

space for airflow

1

Y Installation must meet all Na-

tional and Local Codes −

have only qualified persons

make this installation.

Y Special installation may be

required where gasoline or

volatile liquids are present −

see NEC Article 511 or CEC

Section 20.

Y Disconnect and lockout/tag-

out input power before con-

necting input conductors

from unit.

Y Always connect green or

green/yellow conductor to

supply grounding terminal

first, and never to a line ter-

minal.

1

Rating Label

Supply correct input power.
2

Plug

3

Receptacle

Connect plug to receptacle.
4

Black And White Input

Conductor (L1 And L2)

5

Green Or Green/Yellow

Grounding Conductor

6

Input Power Cord.

7

Disconnect Device (switch

shown in the OFF position)

8

Disconnect Device Grounding

Terminal

9

Disconnect Device Line

Terminals

Connect green or green/yellow

grounding conductor to disconnect

device grounding terminal first.
Connect input conductors L1 and

L2 to disconnect device line termi-

nals.
10 Over-Current Protection
Select type and size of over-current

protection using Section 3-12

(fused disconnect switch shown).
Close and secure door on discon-

nect device. Remove lockout/tag-

out device, and place switch in the

On position.

L1

L2

230 VAC, 1

3

7

6

L1

L2

1

=GND/PE Earth Ground

5

4

8

9

10

Advertising