C. wall penetration framing – Heat & Glo Fireplace HEAT&GLO ST-36TRB-IPI User Manual

Page 37

Advertising
background image

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. i • 3/13

37

Figure 8.5 Wall Penetration

* Shows center of vent framing hole for top or rear venting. The center of the

hole is one (1) inch (25.4 mm) above the center of the horizontal vent pipe.

C

D

A*

B*

10 in.

10 in.

12 in.

12 in.

A*

B*

C

D

43-3/4 in.

28 in.

42-3/4 in.

27 in.

C. Wall Penetration Framing

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield fi restop(s). The wall shield
fi restop maintains minimum clearances and prevents cold
air infi ltration.

• The opening must be framed on all four sides using the

same size framing materials as those used in the wall
construction.

• SLP pipe - A wall shield fi restop must be placed on each

side of an interior wall. A minimum 1-1/2 in. (38 mm)
overlap of attached heat shields must be maintained.

• DVP pipe - A wall shield fi restop is required on one side

only on interior walls. If your local inspector requires a
wall shield fi restop on both sides, then both wall shield
fi restops must have a heat shield (refer to Section 16.B)
attached to them.

• See Section 10.M for information for regarding the in-

stallation of a horizontal termination cap.

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncom-
bustible materials such as concrete, a hole with diameter
one inch greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall
shield fi restop is only required on one side and no heat
shield is necessary.

CORRECT

INCORRECT

• If the combustible materials are not in place at the

time of install the elbow heat shield may be screwed
to the exhaust pipe (see Figure 8.4). Cut the tabs as
shown and bend down. Secure the heat shield to the
pipe maintaining 3 inch to 4 inch between the pipe and
shield.

Figure 8.4

Figure 8.3

COMBUSTIBLE SURFACE

DIRECTION

UP

HEAT SHIELD

90º ELBOW

SCREW

3 in.

(76 mm)

Note: When terminating horizontally off the top of the unit
using SLP pipe, a 10 in. x 10 in. framing hole is required.

Advertising