Warning, Termination locations – Hearth and Home Technologies Bravo User Manual

Page 9

Advertising
background image

Hearth & Home Technologies, Inc. • Bravo, Aztec • InD • 703-900 Rev. N • 8/06

9

A. Vent Termination Minimum Clearances

Fire Risk.

Explosion Risk.

Maintain vent clearance to combustibles as
specifi ed.

WARNING

• Do not pack air space with insulation or

other materials.

Failure to keep insulation or other materials
away from vent pipe may cause fi re.

Roof Pitch

H (Min.) Ft.

Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0

Figure 4.1

Figure 4.2 Minimum Height from Roof to
Lowest Discharge Opening

Termination Locations

4

Measure horizontal clearances from this surface.

Measure vertical clearances from this surface.

Figure 4.3 Multiple Vertical Termination

Figure 4.2 specifi es minimum vent heights for various
pitched roofs.

(See Figure 4.4 for specifi c clearances)

* 3 foot minimum in snow regions

H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING

Gas Termination

Wood & Fuel Oil Termination

A

6 in.

20 in.

20 IN.

(MINIMUM) TO

PERPENDICULAR

WALL

(GAS ON LY)

GAS

TERMIN ATION

GAS, WOOD OR FUEL

OIL TERMINATION

Advertising
This manual is related to the following products: