Frymaster D50 Series User Manual

Page 4

Advertising
background image

Decathlon Series Gas Fryers (CE)

Installation & Operation Manual

TABLE OF CONTENTS

Page #

1.

INTRODUCTION 1-1

1.1

Applicability and Validity 1-1

1.2

After Purchase 1-1

1.3

Ordering Parts 1-1

1.4

Service Information 1-2

1.5

Computer Information 1-2

1.6

Safety Information 1-2

1.7

Service Personnel 1-3

2.

IMPORTANT INFORMATION 2-1

2.1

Receiving and Unpacking Equipment 2-1

2.2

General 2-1

2.3

Principles of Operation 2-2

2.4

Rating Plate 2-3

2.5

Pre-Installation 2-3

2.6

Air Supply and Ventilation 2-4

2.7

Equipment Installed at High Altitudes 2-5

2.8

Conversion of Units 2-5

3.

INSTALLATION 3-1

3.1

Installing the Fryer 3-1

3.2

Leveling the Fryer (Fryers equipped with legs only) 3-1

3.3

Installing Casters and Legs 3-2

3.4

Gas Categories 3-3

3.5

Gas Connections 3-4

3.6

Adjustments/Adaptation to Different Gases 3-7

3.7

Electrical Connections 3-11

Advertising
This manual is related to the following products: