GE VERTICAL DRILLING MOTOR GE752 User Manual

Page 25

Advertising
background image

Vertical Drilling Motor, Type GE752, GEK–91584D

25

FIG. 16. PULLER TOOLS (41D731569 CHG. 0). E–14383C.

REF

DESCRIPTION

REF

DESCRIPTION

REF

DESCRIPTION

4

CLAMP PLATE

12

NUT, 5/8–11

21

STUD

5

BOLT

18

RING

22

STUD

6

PRESSURE CAP

20

STUD

23

NUT, 7/16–14

8.

Reach into the drive–end of the motor and dis-
connect grease tubes.

a. On UP1 and AUP1 models, disconnect two

grease tubes (21 and 22) from the inner bear-
ing cap (51). Pull these tubes out through
their hole in the frame. The sealing RTV in the
hole will separate with sufficient force.

b. On UP2 and AUP2 models, disconnect one

grease tube (21) from the inner bearing cap
(51). Pull this tube out through its hole in the
frame. The sealing RTV in the hole will sepa-
rate with sufficient force.

c. On all other models, only one grease tube is

used, connected between the inner bearing
cap and the framehead. Remove this tube.

9.

Place three 0.125 in. spacers (wedge shaped)
around the armature in the air gap between the
armature and the fields to maintain a vertical atti-
tude of the armature and to prevent the armature
from contacting the fields.

10. Remove bolts (10) and lockwashers (12) from

the framehead (55). Insert bolts into the jackout
holes in the framehead.

11. Install a lifting bail, Fig. 14, onto the end of the

shaft.

12. Line up the hoist cable with the centerline of the

armature before engaging the hook in the lifting
bail on the end of the shaft. Engage the hook and
lift slightly. With sufficient strain on the hoist
cable to take the weight of the armature off the

Advertising