GE VERTICAL DRILLING MOTOR GE752 User Manual

Page 33

Advertising
background image

Vertical Drilling Motor, Type GE752, GEK–91584D

33

49

48,77

37

61

60,78

49

17,
71

32

70

8

67

9,65

6,
66

32

3

52,
76

11

13

33

29

7,
69

5,
68

16

1

ASSEMBLE AROUND
BUTTED JOINT OF PT48

ASSEMBLE IN LINE
WITH NO. 1 SLOT

3/4 LAPPED

P70 TO BE APPLIED
OVER P68 TO LEVEL
THE SURFACE

28 ACTIVE TURNS AT
400 50 LB. TENSION
OVER TOP OF EQUALIZERS

EXTEND A THIN COATING
OF PT32 OVER TOP OF
EQUALIZERS BOTH DECKS

1/4

4–1/4

3/4 REF.

+

ASSEMBLE AROUND
BUTTED JOINT OF PT48

1/4

NOTE FOR P54:
MATL: 41B537080P1
ALT. MATL: 41A230144P3

NOTE FOR P57:
MATL: 41A230144P40

3/8
REF.

53

57

54

3

5/8

11–1/4 R.

29

TOP COILS

BOTTOM COILS

EQUALIZER CONNECTIONS

COMM. SEGMENTS

TO #183

TO #185

TO #1

TO #96

TO #94

TO #92

NUMBERED SEGMENTS ARE FOR
PURPOSE OF INDICATING SPAN OF
EQUALIZER CONNECTIONS AND DO
NOT NECESSARILY CORRESPOND
TO NUMBERED SEGMENTS IN
MAIN CONNECTION DIAGRAM.

30

MAIN WINDING
CONNECTIONS
C

L

SLOT #1
ON MICA

C

L

SLOT #16

TOP COILS

SLOT #15

ORPHAN
COIL

SLOT #1

BOTTOM COILS

NOTE FOR P62:
APPLY TO SIDES OF CORE SLOT
ON PINION END ONLY.
INSTALL P11.

NOTE FOR P47:
ENCLOSE ONE IDENTIFICATION C–SIZE
PRINT OF 41D730423 IN EACH
CARTON OF SUPPLY INSUL.

NOTE FOR P32:
TAPE OVER RISERS WITH 3/4 WIDE A2L14B GLASS TAPE
LEAVING 1/4 IN. OF RISERS EXPOSED ON THE CORE END. FILL
BETWEEN ARMATURE LEADS BEHIND RISERS AND OVER
BACK 1/4 IN. OF RISER. WRAP OVER PUTTY WITH A16B39B
MYLAR TAPE AND BAKE AS PART OF THE PREHEAT PERIOD
FOR INSTALLING P37.

NOTE FOR P37 (C.E. BINDING):
APPLY THE P37 PERMANET CE BINDING (COLD TAPE TO HOT
125–135 C ARMATURE)
APPLY 77 ACTIVE TURNS OF P37 AT 500 25 LB. TENSION.

+

FIG. 19 ARMATURE INSULATION (41D731545 CHG. F). E–18156A.

Advertising