GE VERTICAL DRILLING MOTOR GE752 User Manual

Page 46

Advertising
background image

GEK–91584D, Vertical Drilling Motor, Type GE752

46

17

15,16

29

37

15,16

10

11,
45

VIEW AT Z OF
BRUSH HOLDER
CONNECTION

15,
16,
17

7

18,
19

5

4

6

30

62

33,
35

8

16,
17,
54

31

1

22,
49

A2

12,46

A1

11,45

29

26

28

10

15,16

Z

E

E

APPLY ONE COAT OF P23
AFTER ALL P18 & P19 TAPINGS.

VIEW OF COMM. END

18,19

9

15,
16,
17

2

24 SEE NOTE

26

D

3

13,50
F2

13,50
F1

22,
49

32,35,74

2

62

3

1

27

FILL C’BORES
WITH P25
(24 PLACES)

VIEW OF PINION END

20

21

BEFORE ASSEMBLING
CONNECTIONS INSULATE
9 O’CLOCK CABLE SUPPORT
AS SHOWN WITH P20 TAPED
WITH P21 (COMM. END)

INSULATE EXCITING & COMMUTATING FIELD COIL
TERMINALS BY FILLING ALL CAVATIES & COVERING
ALL BOLT HEADS WITH P24 THEN INSULATE ENTIRE
TERMINAL ASSEMBLY WITH P18 & P19 AND THOROUGHLY
BRUSH WITH P23.

15,
16,
17

7

18,
19

5

26

6

18,19,24,30

11,47
A1

12,48
A2

22,
49

8

33,35

62

31

1

29

4

15,16

28

10

Y

E

E

D

VIEW OF COMM. END

10

37

17

15,16

30

11,47

15,16,18,19,24

VIEW AT Y OF
BRUSH HOLDER
CONNECTION

18,19

9

15,
16,
17

2

1

24 SEE NOTE

3

62

32,35,74

2

22,
49

13,50
F2

13,50
F1

3

VIEW OF PINION END

27

FIG. 29. COILED FRAME ASSEMBLY (41D732353 CHG. N). E–39094A.

Advertising