GE DPGT750EC/GC User Manual

Page 63

Advertising
background image

– 63 –

18. Attach the washer control board to the new

backsplash by replacing the four screws
removed from the washer control board
earlier.

23. Secure the new backsplash to the washer

using the 2 screws removed earlier.

22. Insert the tabs on the bottom front of the new

backsplash into the slots on the washer and
rotate the backsplash into place.

21. Place the gray wire from the serial port under

the strain relief of the new backsplash.

Screw

Screw

Rear of Washer

24. Reconnect house utilities.

25. Plug the washer and dryer back in.

19. Connect the washer control board to the new

backsplash by sliding the ribbon connector on
the new backsplash onto the metal pins on the
control board and pushing in. Make sure the
ribbon is not twisted before inserting the
connector.

Strain Relief

Screws

20. Secure the new washer backsplash to the

rear cover using the 2 screws removed
earlier.

Advertising