Motor 110v, Motor 220v – Grizzly 1 1/2 HP Cyclone G0703 User Manual

Page 15

Advertising
background image

Model g0703/g0703p (Mfg. Since 3/12)

-13-

4. remove the wire nuts indicated in figure 6.

MOTOR 110V

Hot

Neutral

Ground

1

2

3

4

Run

Capacitor

40MFD

250VAC

GND

Start

Capacitor

300MFD

125VAC

G

W

Power

Switch

Circuit

Breaker

Circuit

Board 110V

L2

L1

COM

M2

M1

110 VAC

(Prewired)

L5-30 Plug

(As Recommended)

figure 6. Motor wires at 110V.

remove

remove

5. Connect the motor wires, as shown in

figure 7, with wire nuts. once snug, use
electrical tape to secure each wire nut to the
wires it connect. this will reduce the likeli-
hood of the wire nut loosening during motor
operation.

2

Run

Capacitor

40MFD

250VAC

GND

Start

Capacitor

300MFD

125VAC

Power

Switch

Thermal

Overload

Circuit

Board 220V

L2

L1

COM

M2

M1

4

3

1

MOTOR 220V

Hot

Hot

Ground

6-15 Plug

(Rewired 220V)

220

VAC

G

figure 7. Motor wires repositioned for 220V.

re-Connect
and tighten

re-Connect
and tighten

6. remove the wires connected to the circuit

board, as indicated in

figure 8.

figure 8. location of wires to remove from

circuit board.

2

Run

Capacitor

40MFD

250VAC

GND

Start

Capacitor

300MFD

125VAC

Power

Switch

Circuit

Breaker

Circuit

Board 220V

L2

L1

COM

M2

M1

3

4

1

MOTOR 220V

Hot

Hot

Ground

220

VAC

G

remove

7. remove the three screws indicated by the

short black arrows, see

figure 8, on the

110V circuit board, remove the circuit board,
then secure the 220V circuit board with the
three screws.

8. re-connect the wires removed in step 6 to

the 220V circuit board exactly as they were
connected to the 110V circuit board.

9. re-install the remote control receiver panel

with the screws removed in

step 3.

10. install a nEMA 6-15 plug, according to the

plug manufacturer's instructions included with
the plug. if no instructions were included, use
the wiring diagram on

page 45.

Advertising