GE ZV850 User Manual

Page 10

Advertising
background image

10

Installation

36" Island Vent Hood

Wiring
• Route house wiring through the ceiling hole

and pull a length to reach the hood junction
box, approximately 6” below the support.

• Tape the wire to the front of the frame

support to prevent damage during installa-
tion and service.

7

Step

Size And
Install
Ductwork

To Find Required Duct Length:
• Measure from house duct flange to bottom

of support frame. (Dimension A)

– Add at least 1” to Dim. A for duct overlap at

the top.

– Subtract 1-3/4” for hood insertion into the

bottom of the frame to determine required
duct length.

• Cut the 6” duct to required length.
Note:

The bottom of the duct must be external

(female) connection to the top of the hood.
The bottom end should be flared slightly, to
facilitate installation of the hood.
• Install duct up through support frames and

attach to house ducting with sheet metal
screws.

• Seal the connection with duct tape.

Secure
Wiring

Step

6

Ceiling

Support

Frames

Tape

House

Wiring

Front Side

Ceiling

Duct

Dim. A

Duct Connection
To Hood

Bottom Support

Frame Flange

House Duct

1-3/4"

Side

View

Support

Frame

Required

Duct

Length

Advertising