GE ZV850 User Manual

Page 12

Advertising
background image

12

Installation

36" Island Vent Hood

10

Step

Connect
Electrical

Verify that power is turned off at the source.

CAUTION

If house wiring is not 2-wire with a
ground wire, a ground must be
provided by the installer.
When house wiring is aluminum,
be sure to use U.L. approved anti-
oxidant compound and alumi-
num-to-copper connectors.

WARNING

• Install strain relief into the knockout of the

junction box cover.

• Insert house wiring through strain relief and

tighten.

• Connect white leads to branch circuit white

lead.

• Connect black leads to branch circuit black

lead.

• Connect green/yellow leads to branch

circuit green or bare ground lead.

• Secure all connections with wire nuts on

each electrical connector.

• Push wires into junction box and replace

cover. Be sure wires are not pinched.

9

Step

Install
Hood

Note: TWO PEOPLE ARE REQUIRED TO
COMPLETE THIS INSTALLATION!

• Lift the hood up to the support frame.

Carefully align the hood mounting studs
into the support frame holes, and at the
same time, guide the hood duct connector
into the house duct.

• Install 4 nuts and lock washers to the mount-

ing studs. Tighten with a 10mm wrench.

• Check hood level in both directions.
• Check to be sure that the duct is positioned

over the hood connector.

• Seal the duct connection with duct tape.
Note:

Do not drive screws through lower duct

connection. Doing so will prevent proper
damper operation.

Align
Mounting
Studs

Align Duct
Connector to
House Duct

Stop Screw

Install

4 lock

washer

and 4 Nuts

Bottom

Duct

Cover

Advertising