GE ZV850 User Manual

Page 9

Advertising
background image

9

Installation

36" Island Vent Hood

• Align the template with the marks on the

ceiling and tape in place.

– Be sure the template is oriented correctly,

with the front of the hood.

• Use a plumb to check to be sure the mount-

ing holes will provide parallel alignment
with the countertop below.

• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use

a 5/32” bit and drill approximately 1-1/2”
deep.

• Cut the 6-1/4" dia. duct opening and

approx. 1" dia. wire access hole.

Install upper support frame
• Secure the upper support frame to the

ceiling joists and/or cross framing with
the 4 screws provided. For maximum
rigidity and strength, the screws must be
driven into the center of the joists and/or
cross framing.

• Check to be sure the support frame is

level, vertically and horizontally.

Install lower support frame
• Insert lower support frame (from required

accessory ZX858, ZX859 or ZX8510) into the
upper support frame and loosely secure with
8 screws and washers (4 on front and 4 on
back sides).

• Adjust the lower support frame up or down

to the desired height above the countertop.
Tighten screws.

Important:

Again, check to be sure the support

is level in both directions. There is no way to
level the hood after the hood is secured to the
frame.

4

Step

Mount
Template

5

Step

Install
Support
Frame

*Note: 39-1/8" to top of hood flange can be increased

up to 42" max.

**75-1/8" min. to floor, 77-7/8" max.

Wire Access Hole

Front of Hood

25-1/2" Recommended

13-5/8

*39-1/8"

Countertop

Hood
Mounting
Flange

Lower Support

**75-1/8"

to Floor

Support

Frame

Opening

Upper

Support

Frame

Lower

Support

Frame

Check Level in
Both Direction

Front

Of

Hood

Advertising