Installation preparation, Advance planning – GE ZV850 User Manual

Page 6

Advertising
background image

6

Installation Preparation

36" Island Vent Hood

Advance
Planning

1

Step

Note: The cross framing
must be spaced 8-3/4” on
the side from centerline to
centerline in order to
accept the hood mounting
screws.

Plan the location
Determine the exact location of the vent hood.
• Use a plumb to check location to be sure

countertop/cooktop location below the hood
will align exactly.

• The hood should project forward 1-1/2”

beyond the front edge of the cooking appli-
ance. See illustration.

• Observe the recommended 25-1/2" space

between the cooking surface and bottom of
hood.

Ceiling

Hood
Ducting
Centerline

Side View

Approx. 1-1/2"
Beyond Cooking
Surface

Cooktop

Countertop

27-1/2"

Hood

Front

13-3/4"

Ceiling support structure
• At the hood location, install 2 x 4 cross

framing between ceiling joists as shown.

• The 2 x 4 cross framing can be installed

standing or flat, depending on duct run.
See illustration of ductwork, page 7.

*The framing should be spaced 8-3/4” on the sides and 7-5/8" at
the front from centerline to centerline to accept mounting screws
in the vent support frame.

Typical Support Frame Mounting

8-3/4"
Cross

Framing

Top View of Support Framing

*7-5/8"

16"

Joist

Ceiling

Cross

Framing

Support

Frames

Side

View

Upper

Lower

8-3/4"

Front of

Hood

Advertising