Upright “standard” connections - right side, Upright “standard” connections - left side – Goodman Mfg GKS9 User Manual

Page 19

Advertising
background image

19

2. Secure Hose A to front cover drain port with a red hose

clamp. Route hose to rear side panel grommet hole.

NOTE: For left side drainage, grommets will have to be relocated
to left side panel.

3. Cut and remove 1/4 inch from the end of the drain port on

the rubber elbow.

4. Insert Tube 1 into rubber elbow drain port and secure with

silver hose clamp. Angle tube outward toward front of
furnace.

5. Right side drains

Cut 17 3/4 inches from the long end (end opposite the
bend) of Hose B. Save the part with the bend and discard
the 17 3/4 inch piece that was cut. Secure the remaining
hose to Tube 1 with a green hose clamp. Route the other
end of Hose B to front right side panel grommet hole.

Left side drains
Cut “X” inches from the long end of Hose B and discard.
Refer to table for appropriate length to cut. Secure remaining
hose to Tube 1 with a green hose clamp. Route other end
of Hose B to front left side panel grommet hole.

Cabinet Width

(inches)

Models

(kBTU_Tons)

"X" Length to Cut From Long

End of Hose B

045_30

070_30

070_40

090_40

090_50

115_50

24 1/2

None

17 1/2

21

7 inches

3 1/2 inches

Upright “Standard” Connections - Right Side

DRAIN
TRAP

FRONT COVER

DRAIN PORT

TUBE(S) 2

GREEN

HOSE

CLAMPS

(3 PLACES)

RIGHT SIDE

PANEL

RUBBER ELBOW

DRAIN PORT

TUBE 1

SIDE PANEL

GROMMET

HOLES

HOSE

B

HOSE

A

RUBBER

ELBOW

RED HOSE

CLAMP

SILVER HOSE CLAMP

Upright “Standard” Connections - Left Side

LEFT

SIDE PANEL

FRONT COVER

DRAIN PORT

HOSE A

SIDE PANEL

DRAIN

HOLES

TUBE(S) 2

DRAIN

TRAP

GREEN HOSE

CLAMPS

(3 PLACES)

TUBE 1

RUBBER

ELBOW

HOSE B

RUBBER

ELBOW

DRAIN PORT

RED HOSE

CLAMP

SILVER HOSE

CLAMP

Advertising