DCA-600SSK — OPERATION AND PARTS MANUAL (STD)— REV. #7 (04/30/10) — PAGE 45

If applicable perform the following:

Apply commercial power to the internal battery charger
receptacle (to ensure good starting) via commercial power.
An external power cord will be required. This capability is an

option

.

Apply commercial power to the jacket water heater
receptacle (not necessary for warm climates) via commercial
power. An external power cord will be required. This capability
is an

option

.

DCA-600SSK — GEN. START-UP PROCEDURE (MANUAL)

Figure 43. Load Connections

BEFORE STARTING

4. Close all engine enclosure doors (Figure 44).

Figure 44. Engine Enclosure Doors

Steps 1 thru 19 are referenced
for Engine Operating Panel up
to S/N 3698616. See Figure 41
below. This unit has an

ignition

switch and a throttle handle.

NOTE

Figure 41. Engine Operating Panel

Up To S/N 3698616

1. Place the

main, G.F.C.I. and aux. circuit breakers (Figure 42)

in the “OFF” position prior to starting the engine.

2. Connect the load to the

UVWO terminals or auxiliary

receptacles as shown in Figure 43. These load
connection points can be found on the output terminal
panel. To gain access to the UVWO terminals or other
power receptacles, unlock the access cover and lift the
door.

3. Tighten the UVWO terminal nuts securely to prevent

load wires from slipping out.

Figure 42. Main, Aux. and GFCI

Circuit Breakers (OFF)

Generator and Control Panel

The engine's exhaust contains harmful emissions.
ALWAYS have adequate ventilation when operating.
Direct exhaust away from nearby personnel.

CAUTION - LETHAL EXHAUST HAZARD

NEVER! manually start the engine with the main, GFCI
or

auxiliary circuit breakers in the ON (closed) position.

WARNING - STARTING THE GENERATOR