Minuteman UPS SNMP-32 Series User Manual

Page 31

Advertising
background image

31

3. RPM

Schedule

This screen is for scheduling the RPM’s outlets to perform a specific Action (Fig. 46). To add a new schedule,
select the “New” button. To make changes to the current schedule, select [Edit]. To remove a schedule, select
[Delete].







Fig. 46-RPM Schedule Screen


After selecting the “New” button or [Edit], the following screen will appear (Fig. 47). Select the desired shutdown
and restart configuration and then click the Save button.

• RPM: The user can select which RPM to perform the Action (RPM01-RPM16).

• Outlet: The user can select which outlet to perform the Action.

• Outlet Action: The user can select to turn on the RPM’s outlet or turn off the RPM’s outlet.

• Date: The user can configure the RPM to perform the Action ‘Once’ on the specified date (format:

mm/dd/yyyy) or the RPM can be configured to perform the Action ‘Every’ week on the specified day.

• Time: The user can select the time of day to perform the Action (format: 24-hour).











Fig. 47-New Schedule Event Screen



















Advertising