Installation, 8 connection of iec cables to output receptacles – MGE UPS Systems 5000 RT User Manual

Page 20

Advertising
background image

34008030EN/AA

- Page 20

2. Installation

2.8 Connection of IEC cables to output receptacles

1 - Connect the equipments to the UPS using
the cables (49).
It is preferable to connect the priority
equipments to the four outlets (2) and the non
priority equipments to the four outlets (1) that
can be programmed in pairs (1 and 2).
Connect any high-power devices to the 16 A
outlet (3)
To program shutdown of outlets (2) during
operation on battery power and thus optimise
the available backup time, the MGE UPS
SYSTEMS communication software is
required.

2 - Fit the connection securing system (44)
that prevents the plugs from being pulled out
accidentally.

2

1

44

49

3

Advertising
This manual is related to the following products: