Chapter 2 installation, 1 hardware installation, 2 pre-installation requirements – MicroNet Technology SP3508A User Manual

Page 6: 3 cabling requirements

Advertising
background image

Chapter 2 Installation

2.1 Hardware

Installation

This section describes how to install the switch and establish network
connections. Users may install the user on any level surface. However,
please take note of the following minimum site requirements.

2.2 Pre-installation

Requirements

Prior to the start of actual hardware installation, make sure users can provide
the right operating environment, including power requirements, sufficient
physical space, and proximity to other network devices that are to be
connected.

Verify the following installation requirements:

y Power requirements: AC 85V~265 V at 50~60 Hz.
y The Modem should be located in a cool dry place with at least 10cm

of space at the front and back for ventilation.

y Place the switch out of direct sunlight, and away from heat sources or

areas with a high amount of electromagnetic interference.

2.3 Cabling

Requirements

Before making any connections to the Modem, note the following rules:

Connection Type

Cable Requirements

Maximum Length

Ethernet Port (RJ-45)

y 100 Mbps: Cat 5 UTP
y 10 Mbps: Cat 3-4 UTP

100 meters max for

MUX or HUB to

endpoint.

3

Advertising