Mr. Heater MH25LP User Manual

Page 8

Advertising
background image

E8

Installation instructions and Owner’s Manual

Model # MH25NG/LP

HS25NG/LP

LEAVE 2 THREADS BARE

USE MODERATE AMOUNT OF PIPE DOPE

3/4” MAXIMUM

THREAD LENGTH

1/2” BLACK PIPE

GAS VALVE BODY

1/2” MAXIMUM

DEPTH OF IN-

SERTS INTO GAS

VALVE


Refer to National Electrical Code NFPA70-1993 and

for Canadian installations to current CODE C22.1-

3. CONNECTING HEATER TO GAS SUPPLY

WARNING: Depending on local codes and require-

ments and the installer’s skill level, the sizing and

installation of gas lines required to safely and efficiently

supply the heater may require the assistance of a pro-

fessional. If in doubt as to these requirements, discuss

the requirements of this manual with the dealer from

whom the heater was purchased and your gas supplier.

3.1 Gas Supply Requirements

See Tables 1 and 2 for gas supply minimum, maxi-

mum, operating, and manifold pressures for both

heater models. Pressures are provided in inches of

W.C. (water column). Also, see heater rating plates

located on the heater.

WARNING: Model MH/HS25NG is designed to burn

natural gas and it comes equipped with a regulator.

The regulator is built into the gas valve. The maximum

inlet pressure to this regulator is 1/2 psi (14 in. W.C.) If

gas line pressure exceeds 1/2 psi, then an additional

regulator must be installed before the heater/regulator

to step down the pressure to a maximum of 1/2 psi.

Most residential natural gas services provide a line

pressure of 4 oz. (6.9 in. W.C.). If in doubt consult

your natural gas supplier.

To ensure the best performance from your natural

gas heater make sure the supply manifold pres-

sure is at least 6” W.C.

WARNING: Model MH/HS25LP is designed to burn liq-

uefied petroleum (LP) gas and it comes equipped with

a regulator. The regulator is built into the gas valve. The

maximum inlet pressure to this regulator is 1/2 psi (14

in. W.C.). If gas line pressure exceeds 1/2 psi, then an

additional regulator must be installed before the heater/

regulator to step down the pressure to a maximum of

1/2 psi.

• To ensure the best performance from your LP gas

heater, make sure the supply manifold pres-

sure is at least 1/2 psi (14 in W.P.).

3.2 Piping Requirements

All piping installed must comply with local codes and

ordinances or with National Fuel Gas Code,
ANSI Z223.1 (NFPA 54), whichever takes precedence.

When installing piping, the following requirements

must be taken into consideration: Canadian installa-

tions must comply with the B149.1.2 Gas Code.

Use new properly reamed black pipe free from

chips.

Apply a good quality pipe compound to all

male threads as shown in Figure 5 prior to as-

sembly. If LP gas is the fuel, ensure that pipe

compound is resistant to LP gas. Do not use

Teflon™ tape.

Figure 5. Pipe Compound Application

Male threads on pipe to be installed into gas

valve shall meet the requirements of Figure 6.

Threads longer than those shown in the figure

may cause gas valve distortion and malfunc-

tion.

A sediment trap meeting the typical require-

ments of Figure 7 shall be installed in the line

to the gas valve.

A dedicated shutoff valve for the heater must

be installed in the gas supply line.

3.3 Piping Installation

While ensuring that all of the above gas supply re-

THERMOSTAT

POWERPILE GAS VALVE

POWERPILE GENERATOR

Figure 4. Connection Diagram

Figure 6. Gas Valve Connection Requirements

Advertising
This manual is related to the following products: