Motorola POWERBROADBAND T2-2500 User Manual

Page 23

Advertising
background image

WallPlate Installation

Motorola, Inc.

549453-001-00-a

Page 23 of 51

I

I

n

n

s

s

t

t

a

a

l

l

l

l

a

a

t

t

i

i

o

o

n

n

3

3

:

:

E

E

x

x

t

t

e

e

r

r

n

n

a

a

l

l

m

m

o

o

u

u

n

n

t

t

i

i

n

n

g

g

t

t

a

a

b

b

s

s

If the first two Installation methods are not possible e.g. European box mounted externally on the base molding or
other surface, then mount the m2 WallPlate using the external mounting tabs.

NOTE:

Order the RJ11 long cable assembly from Motorola PBN. Part number 61299

Step 1: Connect RJ11 cable

1. Connect 2m cable (Tut p/n 61299) to the internal RJ11

connector on the m2a circuit board

2. Route the RJ11 cable out of the bracket using the exit hole

next to the Ethernet ports

Step 2: Assemble the m2 WallPlate

3. Snap the cover and bracket together

4. Install WallPlate unit to the wall or structurally sound flat

surface using the external mounting tabs.

R

R

e

e

m

m

o

o

v

v

e

e

t

t

h

h

e

e

c

c

o

o

v

v

e

e

r

r

t

t

o

o

s

s

e

e

r

r

v

v

i

i

c

c

e

e

t

t

h

h

e

e

W

W

a

a

l

l

l

l

P

P

l

l

a

a

t

t

e

e

1. Remove the two (2) set screws in the top of the cover.

2. Insert a flat blade screwdriver between the bottom tab and the m2a cover

3. Apply a prying motion as shown to loosen the bottom hook on the m2a cover

4. Repeat the steps on the top tab of the m2a cover





Advertising