Motorola POWERBROADBAND T2-2500 User Manual

Page 26

Advertising
background image

Installation

Steps

Motorola, Inc.

549453-001-00-a

Page 26 of 51

I

I

n

n

-

-

R

R

o

o

o

o

m

m

I

I

n

n

s

s

t

t

a

a

l

l

l

l

a

a

t

t

i

i

o

o

n

n

Note:

These instructions follow the Installation 1 procedure from the previous chapter. Please consult

WallPlate Installation

for variations of the installation routine.

Tools Required:

Number 2 Philips head screwdriver
Number 2 flat blade screwdriver

Components provided with the m2a WallPlate:

1 – m2a WallPlate bracket and cover with circuit board
1 – 150mm (6”) RJ11 pigtail cable
1 – RJ11 blanking plug
2 – Number 6 oval head screws, 0.25”

Components required to purchase:

Regulated 12V power supply. Use of the wrong power supply could result in damage to your WallPlate unit. Please
order a small quantity of regulated 12V power supplies from Motorola PBN to use during installation.

If you do not have the correct regulated 12V power supply –

STOP

. Order a regulated 12V power supply from your

Motorola PBN sales representative.

Step 1

1. Loosen screws on wall plate approximately 6mm (1/4”)
2. Attach the bracket using the keyhole slots
3. Tighten screws until the bracket is firmly attached, do not over tighten

Step 2

Connect 150mm (6”) cable (supplied) between m2a circuit board and existing RJ11 jack.

Advertising