Ingersoll-Rand 7120 User Manual

Page 51

Advertising
background image

48

7/120 (P425AWIR), 9/110 (XP375AWIR), 10/105 (HP375AWIR), 14/85 (VHP300AWIR),
7/170 (P600WIR), 10/125 (HP450WIR), 14/115 (VHP400WIR)

Initial 500

miles

/850 km

Daily

Weekly

Monthly

3 Monthly.

250 hrs.

6 Monthly.

500 hrs

12

Monthly.

1000 hrs

Scavenge line

C

Pressure system

C

Engine breather element

C

Pressure gauge

C

Pressure regulator

C

Separator tank (2) exterior

CR

Lubricator (Fill)

C

2 Yrs

4 Yrs

6 Yrs

Safety valve

C

Hoses

R

Separator tank (2) interior

C

*Disregard if not appropriate for this particular machine.

(1)

or 3000 miles/5000km whichever is the sooner

(2)

or as defined by local or national legislation

C

= Check (adjust, clean or replace as necessary)

CBT

=check before towing.

CR

= Check and report

D

= Drain

G

= Grease

R

=Replace

T

= Test

W I

=or when indicated if earlier.

Refer to specific sections of the operator’s manual for more

information.

ROUTINE MAINTENANCE

This section refers to the various components which require

periodic maintenance and replacement.

The SERVICE/MAINTENANCE CHART indicates the

various components’ descriptions and the intervals when
maintenance has to take place. Oil capacities, etc., can be
found in the GENERAL INFORMATION section of this manual.

For any specification or specific requirement on service or

preventative maintenance for the engine, refer to the Engine
Manufacturer’s Manual
.

Compressed air can be dangerous if incorrectly handled.

Before doing any work on the unit, ensure that all pressure is
vented from the system and that the machine cannot be started
accidentally.

If the automatic blowdown fails to operate, then pressure

must be gradually relieved by operating the manual blowdown
valve. Suitable personal protective equipment should be worn.

Ensure that maintenance personnel are adequately trained,

competent and have read the Maintenance Manuals.

Prior to attempting any maintenance work, ensure

that:–

.

all air pressure is fully discharged and isolated from the

system. If the automatic blowdown valve is used for this
purpose, then allow enough time for it to complete the operation.

.

the discharge pipe / manifold area is depressurised by

opening the discharge valve, whilst keeping clear of any airflow
from it.

MINIMUM PRESSURE VALVE – WHEN FITTED

NOTE: Pressure will always remain in the part of the system
between the minimum pressure valve and the discharge valve
after operation of the auto blowdown valve.

This pressure must be relieved by carefully:

(a) Disconnecting any downstream equipment.

(b) Opening the discharge valve to atmosphere.

(Use hearing protection if necessary).

.

the machine cannot be started accidently or otherwise, by

posting warning signs and/or fitting appropriate anti–start
devices.

.

all residual electrical power sources (mains and battery) are

isolated.

Prior to opening or removing panels or covers to work

inside a machine, ensure that:–

Advertising