Front cabinet support installation, Heat shield installation – Interlink electronic L485SIB User Manual

Page 21

Advertising
background image

21

www.ultrachefgrills.com

4 x N570-0080 (#14 x 1/2”)

3/8”(10mm)

4 x N570-0080 (#14 x 1/2”) 1 X N430-0002

7. Front Cabinet Support Installation

Fasten top rail assembly to the front of side panels using (4) #14 x 1/2” screws. For ease of installation start all screws
before tightening completely. Snap magnet into place as shown.

3/8”(10mm)

8. Heat Shield Installation

Attach heat shield above propane tank ring using (4) #14 x 1/2» screws. Attach one end under lip of back panel and other
end to underside of front cabinet support.

Advertising
This manual is related to the following products: