Preinstallation – Cornelius QUANTUM SERIES User Manual

Page 4

Advertising
background image

Quantum Series Installation and Service Manual

720901120

-

2 -

PREINSTALLATION

R

ECEIVING

Each unit is completely tested and inspected before shipment. At time of shipment, the carrier
accepts the unit and any claim for damage must be made with the carrier.

Upon receiving from the carrier, please, inspect the carton for visible damage. If damage exists,
have the carrier make a note on the bill of lading and file a claim with the carrier.

U

NPACKING

Remove staples securing carton to pallet.

Lift carton up and off of unit.

Remove top insert and shipping bag.

Open the upper cabinet door and remove installation kit.

Remove bolts securing unit to pallet.

Lift unit off of pallet.

Open the package, take legs and secure them to the bottom of the unit.

NOTE: Do not lay the unit on sides or on the back.

Tilt the unit only when securing legs.

If the unit is to be transported from the place where it was unpacked, do not remove the unit
from the pallet. Transport it on the pallet to the installation site.

C

OUNTER

L

OCATION

Select location in well ventilated area, close to grounded electrical outlet. If possible do not
place the unit close to hot and/or steaming machines.

Advertising