Wall Shield Installation

When horizontally venting directly off the rear of the
stove, install the decorative Wall Shield #129349,
(included in the stove), to cover the top of the
venting hole in the wall. See Figure 14.
1. Remove the top four 1/4” hex head screw from the

rear shroud of the stove.

2. Align the holes in the wall shield with the holes in

the rear shroud.

3. Secure the wall shield to the stove with the four

1/4” hex head screws.

Figure 13. Termination clearances to exterior overhangs.

Rear

Shroud

Wall Shield

Figure 14. Install the Wall Shield.

18” Max.

460 mm

Simpson Dura-Vent

Horizontal Termination

Cap #984 or #985

6” (150 mm)

Simpson Dura-Vent

#908B

Two 90 Degree

Elbows

OPTION # 5

Figure 12-5. Horizontal vent with two elbows.

OPTION # 4

Figure 12-4. Maximum horizontal run with single
elbow to a snorkel termination.

76 mm

12 ”

305

mm

2 1/2”

64 mm

Two Simpson

Dura-Vent 90

Degree Elbows

#990B

Simpson Dura-Vent Wall

Thimble Cover #940

Simpson Dura-

Vent Horizontal

Square

Termination

#984

Figure 12-5a. Horizontal vent with two elbows.

OPTION # 5

Simpson Dura-Vent

14” Snorkel #982

Simpson Dura-Vent 45

Degree Elbow

#945

12” (300 mm) and 6” (150 mm)

Max. Horizontal Run

into a 14” Snorkel

Both Draft Restrictors Required

Advertising