Start-up 3-1, Start-up -1 – Sterling STT 1600 User Manual

Page 16

Advertising
background image

3. Start-up

»

This chap ter is di rec ted at the ope ra tors of the equip ment.

This chap ter as su mes ge ne ral skills in dea ling with dry ing sys tems and SPS
(PLC) con trol units.

This chap ter as su mes that the functio nal des crip ti on has been read and un -
ders tood.

It should be en su red in each and every case that the ope ra tors have the re le -
vant skills.

F

Note down all set values of the control system.

Make sure that the cooling appliance is connected to the mains socket in
the electrical cabinet (if present, optional).

Make sure that any condensate penetrating from the cooling appliance
(optional) does not get inside the dryer or the control box.

&

If the in side tem per a ture of the switch cab i net is above +50°C(122°F),
the dryer is switched off af ter 30 min utes if it is op er ated with a cool ing ap -
pli ance (op tional).

0

3

6-

2

M

S

STT 1600

Start-up 3-1

Advertising