3.6. Starting continuous operation

When you have carried through all basic settings, you can start with continuous operation.

F

Make sure that hoppers which are not in use are separated from the
dehumidified air supply.

Make sure that the set drying temperatures are suited for the materials in
the hoppers.

After first filling, do not process the material until after the dwelling time.

If a return air cooler is installed, switch on the coolant circuit of the return
air cooler.

Make sure that the cooling appliance is connected to the mains socket (if
present, optional).

Check setting of the timer.

Select ”Main menu”.
Acknowledge with the ENTER-key.

or

Press the ”F2”-key.

Select ”Dryer on”.

Acknowledge with the ENTER-key.