2.4 Commissioning the Solar Inverter

Prior to starting up the Solar Inverter,

move the housing cover downwards by

releasing the lateral fixation on the right

lower side of the housing and pulling the

four lateral hexagon socket screws tight.

Do not deposit any objects (e. g. this

manual) on the housing of the Solar

Inverter. The ventilation behind the Solar

Inverter must not be obstructed.

If the device is installed outdoors, please

double-check that the cable glands, the

housing cover, and the protection cap of

the SUB-D9 connector (provided this ter-

minal is not allocated) are tight.

Starting-Up and Shutting-Down the

Solar Inverter

As soon as the Solar Inverter has been

mechanically installed and connected to

the power lines, it can be commissioned as

follows. Depending on whether or not you

are using DC main switches, the start-up

and shut-down sequence for the DC and

AC side differs.

Note: The Solar Inverter is supplied from

the grid. If the PV output is high enough,

the Solar Inverter will switch on autom

atically. For that purpose, on and off thres-

hold values have been determined.

Start-up (with DC main switch)

1. Switch the grid connection on with the

external automatic circuit breaker.

2. Switch the PV generator voltage on

by closing the DC main switch. If the

PV input voltage is sufficient, the Solar

Inverter will start and inject solar

energy into the electrical grid. The

injection is indicated by the power

pointer on the display.