Overall systems check and listening test – Sony Ericsson DFP-D3000 User Manual

Page 31

Advertising
background image

7-1

DFP-3000

7.

Overall systems check and listening test.

The basic installation, alignment, and test of the DFP-3000 Cinema Processor System is now complete.

Before signing off on the job, the installer will want to play familiar reference films and listen in the
house to confirm that all is well. It might also be a good idea to repeat the synchronization test of 6.13

with actual film. Adjust the fine lipsync if necessary; using the front panel for this will require the

“SDDS” password.

Advertising
This manual is related to the following products: