Check the LED displays
on the board

(As repuired)

Counter-
measures

Normal

STEP3

STEP2

STEP1

Turn on the power of the S-BUS data link unit

Check the status indicator

Check the system status screen

Check the menu screen

Open the front panel

Check the error code

Execute the test mode

Completion of function check

6-5. Function Check Process

6-5. Function Check Process

After installing the hardware and software of the routing switcher system, check its functions and those of
each device according to the following procedures. The process of the function check consists of three

steps. The checks in step 2 and onward will be performed only when errors have been detected in step 1.
If not, the checking process ends there. When errors have been displayed in step 1, except the cases that

causes are found with the display contents, it is necessary to find out the faulty sections and causes by
performing the checks from step 2. Countermeasures and the methods of fixing the errors are described in

detail in the operation manuals and maintenance manuals provided. For the counter-measures and reme-
dies, refer to the operation manual or the maintenance manual supplied with the unit.