Kobe Range Hoods CX1830GS-8 User Manual

Page 7

Advertising
background image

5

INSTALLATION

PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING

Calculation before Installation

To calculate installation, please refer to Table 1. (All calculation in inches.)

Preparations before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING

THE VENT OPENING.

- Decide the location of the venting pipe from the hood to the outside. Refer to Figure

1.

- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible. This may reduce

the performance of the hood.

- Use duct tape to seal the joints between pipe sections.
- If necessary, prepare back wall frame with cross framing lumber for secure installation.

Using references in Table 1 and measurements on page 15, decide the level of the
lumber. Refer to Figure 2.

- Important: peel protective film off the duct cover and the hood (if any).

TABLE 1

A = Height of Floor to Ceiling
B = Height of Floor to Counter

Top (Standard: 36”)

C = Preferred Height of Counter Top to

Hood Bottom (Recommended 27”
to 30”)

D = Height of Hood
E = Height of the Hood

Installation [A – (B + C)]

F = Height of Duct Cover [E – D]

SAFETY WARNING

HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF
REMOVING ANY PARTS FOR INSTALLING, CLEANING OR SERVICING.

Advertising