Kohler Command CV730 User Manual

Page 156

Advertising
background image

8.40

Section 8
Electrical System and Components

Plunger
Pushed “In”

VOM Meter
Leads

12 volt Test Leads

Test 4. Solenoid Hold-In Coil/Contact Continuity
Test.

Use an ohmmeter set to the audible or Rx2K scale, and
connect the two ohmmeter leads to the two large post
terminals. Perform the preceding test (3) and check for
continuity. See Figure 8-77. The meter should indicate
continuity, if no continuity is indicated the solenoid
should be replaced. Repeat test several times to
confirm condition.

Figure 8-77. Testing Hold-In Coil/Solenoid Contact
Continuity.

Advertising
This manual is related to the following products: