Total refrigerant = units and lines, Table 7 8-ton unit refrigerant charge, Table 8 line charges (field piping) – Liebert 50 & 60Hz User Manual

Page 23: Quick connect fittings, Table 9 refrigerant quick connect sizes and torque, Table 7, Ton unit refrigerant charge, Table 8, Line charges (field piping), Table 9

Advertising
background image

Site Preparation and Installation

15

Refrigerant Charge Requirements:

Total refrigerant charge (R-22) will be required only if units

are evacuated during installation or maintenance. For safe and effective operation, refer to 2.4.3 -

Piping Connections and Coolant Requirements.

Total refrigerant = Units and Lines

Quick Connect Fittings

Be especially careful when connecting the quick connect fittings. Read through the following steps

before making the connections.
1. Remove protector caps and plugs.
2. Carefully wipe coupling seats and threaded surfaces with a clean cloth.
3. Lubricate the male diaphragm and synthetic rubber seal with refrigerant oil.
4. Thread the coupling halves together by hand to insure that the threads mate properly.
5. Tighten the coupling body hex nut and union nut with the proper size wrench until the coupling

bodies “bottom out” or until a definite resistance is felt.

6. Using a marker or pen, make a line lengthwise from the coupling union nut to the bulkhead.
7. Tighten the nuts an additional quarter-turn; the misalignment of the lines shows how much the

coupling has been tightened. This final quarter-turn is necessary to insure that the joint will not

leak. Refer to Table 9 for torque requirements.

Table 7

8-ton unit refrigerant charge

Evaporator

Model No.

Charge (ounces)

3-ton circuit

5-ton circuit

MMD96E

7

7

MMD95E

7

7

Condensing Units

Model No

Charge (ounces)

MCD96A

361

581

MCD95A

361

581

MCD98W

54

94

MCD97W

54

94

Table 8

Line charges (field piping)*

O.D.

Liquid Line

Suction Line

1/2"

7.3 (1.1)

0.2 (0.1)

5/8"

11.7 (1.7)

0.3 (0.1)

7/8"

24.4 (3.6)

0.7 (0.1)

1-1/8"

41.6 (6.2)

1.2 (0.2)

*weight of R-22 in type “L” copper tube: lb per 100 ft (kg per 10 m)

NOTE
When hard piping is used, complete all piping and evacuate lines before

connecting quick connects.

Table 9

Refrigerant quick connect sizes and torque

Size O.D. Cu

Coupling Size

Torque (lb-ft)

3/8"

#6

10-12

1/2"

#10

35-45

7/8"

#11

35-45

1-1/8"

#12

50-65

Advertising
This manual is related to the following products: