Lennox International Inc. MONTECITO ESTATE MONTEST User Manual

Page 15

Advertising
background image

Roof Down Slope Hole Size

DEGREE OF SLOPE

Secure Temp™

S2100+

Nova Temp™

HT6000+

Secure Temp

GX

ACBI

Roof Pitch

7”

7”

0 *

15” (380 mm)

15” (380 mm)

2/12

15-3/8” (390 mm)

15-3/8” (390 mm)

4/12

16-1/8” (410 mm)

16-1/8” (410 mm)

6/12

16-7/8” (430 mm)

16-7/8” (430 mm)

8/12

18-1/4” (465 mm)

18-1/4” (465 mm)

10/12

19-5/8” (500 mm)

19-5/8” (500 mm)

12/12

21-3/8” (545 mm)

21-3/8” (545 mm)

Table 3

* Cross Slope Hole Size

After reaching the location requiring the

elbow, proceed as follows:

Secure Temp

S2100+ / Nova Temp

HT6000+ /

Secure Temp

GX Chimneys

1. Install the first elbow; turn it in the required

direction. Fasten it to the chimney with

the three (3) 1/2” (12 mm) metal screws

provided with the elbow.

2. Install the necessary chimney lengths to

achieve the required offset. Lock the chimney

lengths together: it is recommended to use

three (3) 1/2” (12 mm) screws. If the offset

length is made of two (2) chimney lengths

or more, use an offset support halfway up

the offset. If penetrating a wall, install a wall

radiation shield (see Figures 29 & 30).

3. Use another elbow to turn the chimney

vertically. Secure the elbow, using three

(3) 1/2” (12 mm) screws (provided with the

elbow).

4. Use a plumb bob to line up the center of

the hole. Cut a hole for the chimney in the

ceiling/floor. Frame this hole as described

previously (refer to Chimney Installation

Instructions on Page 14).

5. From below, install a firestop (See Figure

23a).

6. A support (XST+ or XSO+) must be used on

the first 15’ section (5 m).

7. Continue with the regular installation.

ACBI Chimney

1. Install the first elbow. Turn it in the required

direction. To lock it in place, turn 1/8 of a

turn. Fasten the straps attached to the elbow

to the surrounding frame, using nails or

drywall screws (Figure 28).

2. Install the necessary chimney lengths to

achieve the required offset. Lock the chimney

lengths together. If penetrating a wall, use

a wall radiation shield.

3. Use another elbow to turn the chimney

vertically. Lock it to the chimney. Fasten

the straps attached to the elbow to the

surrounding framing using nails or drywall

screws.

4. Use a plumb bob to line up the center of the

hole. Cut a hole for the chimney in the ceiling.

Frame this hole as described previously.

5. From below, install a firestop (see Figure

23b).

6. Continue with the regular installation.

CHIMNEY MODEL ACBI

Collar

Chimney

Flashing

Figure 25

Figure 26

Minimum Chimney Height When Using Elbows

Fireplace Model

MONTEST

Chimney Model

Secure Temp S-2100+ / Nova Temp HT6000+ / Secure Temp

GX / ACBI

Vertical Installation

3.66 m (12’)

Two (2) Elbows

4.57 m (15’)

Four (4) Elbows

5.18 m (17’)

Table 4

OFFSET CHIMNEY INSTALLATION

After reaching the location requiring the elbow, proceed as follows. The minimum chimney height

when using elbows is:

Note: Must return to vertical before penetrating ceiling or floor.

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

15

Advertising