Chapter three • cld-v2800 level iii – Pioneer CLD-V2800 User Manual
Page 29
Advertising
4)
Timing
The timing from the receipt of a command to the return of the status value is
as follows:
• T1 is the time from the receipt of <C/R> at the end of the command string to
the start of command execution, and is within a maximum of 20 ms.
• T2 is the command execution time, and is at least 14 ms.
T2 (before the <C/R>) increases depending on the type of command.
• The minimum processing time for any command (total of T1 and T2) is 14 ms.
Chapter Three • CLD-V2800 Level III
Figure 3-G
Timing Diagram
P
L
<CR>
<CR>
R
TxD
T1
T2
Execution
3-10
TP 120 v. 1.0
• 10/95
CLD-V2800 Level III User’s Manual
T1
≤
20 ms
T2
≤
14 ms
Advertising