N900, Series install 3. assemble the weighing platform, Remove the control module cover – Pitney Bowes N921 User Manual

Page 12: Install the rate prom, Connect weighing platform to control module

Advertising
background image

Page 12

Installation Instructions

N900

series install

3. Assemble the

weighing platform

Place the cover on the weighing
platform. Press down on each corner
to be sure it is completely seated.

4. Remove the control

module cover

Remove the cover from the top rear
of the control module and set aside.

5. Install the Rate PROM

Slide the Rate PROM into the slot with
the unlabelled side facing you. Press
it firmly until it snaps into place. Refit
cover.

6. Connect weighing

platform to control
module

Turn the control module over and plug
the small end of the weighing platform
cable into the back of the module.

Underside of
Control Module

Advertising
This manual is related to the following products: