Page 27, Wire nut to 120vac power, Dip switch settings – Pentair PS4 User Manual

Page 27

Advertising
background image

Page 27

Section 6. Power Center Wiring Diagram

Aux. 4 Relay

Aux. 7 Relay

Aux. 5 Relay

Aux. 6 Relay

Filter Pump Relay

Aux. 3 Relay

Aux. 1 Relay

Li

ne

O

n

e

Low

V

o

lta

ge

R

a

ce

way

(do

n

o

t

run

h

ig

h

vol

tage

w

ir

e

in

thi

s

c

om

p

a

rt

m

e

n

t)

Li

ne

T

w

o

Load

O

n

e

Load

T

w

o

Aux. 2 Relay

Grounding Bar

Wire Nut to

120VAC Power

System Power

Intake

JVA

Cleaner

JVA

Solar

Pump

Return

JVA

Solar

JVA

Elect.

Heater

Re

d

Bl

a

c

k

Gr

ee

n

Whi

te

Ye

llo

w

Gr

ee

n

Bl

a

c

k

Re

d

Br

o

w

n

To Remote

(brown terminal bar)

To Sensors, etc.

(green terminal bar)

To Controller

(red terminal bar)

4 3 2 1

6 5 4 3 2 1

Bl

u

e

Re

d

Bl

a

c

k

Re

d

Bl

a

c

k

F. Pump

Aux. 2

Aux. 3

Aux. 6

Aux. 5

Aux. 4

Relay Sockets

(24 VDC output)

JVA Sockets

(24 VAC output)

# OFF
1 Aux 1
2 1 SPD Pump
3 Aux 3
4 Cool Down
5 Normal
6 Spare Aux

(Pool Mode)

7 See Manual
8 Heater 3 min.

Off

Battery
(9Volt)

Dip Switch Settings

Factory Setting

ON
Cleaner
2 SPD Pump
Spa Spillover
Disabled
See Manual
Spare Aux
(Spa Mode)
See Manual

Re

d

Bl

a

c

k

Not

Used

No

t

U

s

e

d

FI

LTE

R

P

UMP

A

U

X

1

AU

X

2

A

UX

3

AU

X

4

AUX

5

A

U

X

6

A

UX

7

Relay Sockets (24 VDC output)

Relay Sockets (24 VDC output)

When Turned

Heater 5 min.

Off

Aux 1

.

Advertising
This manual is related to the following products: