NEC EXPRESS800 User Manual

Page 37

Advertising
background image

Planning Your System Rack Configuration 3-9

Table 3-4. Determining the Load on a Single Power Source

Component

Voltage

Amps#

VA

Times the
Number of
Systems
Installed

Load

Express5800/120Ld

120

4.6

552

Express5800/120Mc2

120

9.0

1080

Express5800/120Mc3

120

9.0

1080

Express5800/180Ra-7*
Express5800/180Ra-7**

120

5.1

8.5

612

1020

Express5800 ES1400

120

6.0

720

Express5800 HX4500

120

12.0

1440

Express5800 HX4600

120

10.5

1260

Express5800 HV8600

120

10.0

1200

Express5800 LC1400

120

9.0

1080

Express5800 LS2400

120

6.0

720

Express5800 MC2200

120

9.0

1080

Express5800 MC2400

120

9.0

1080

Express5800 MH4500

120

10

1200

3UDEU

Port Concentrator

100

1

100

Monitor

Other

Other

Other

* 4 Processors Installed
** 8 Processors Installed
# Absolute Maximum Ratings

2. Add the individual loads you have listed in Table 3-4 to determine the total

load on the power source.

3. To determine the run time your UPS will provide your system during a

power failure, use Table 3-5 to find your total load and its associated run
time in minutes.

Advertising